VT Level II Specific Quiz - Set 1
Rating
0
0
There are no comments for now.
1.
Per ASME Section V, Article 9, direct visual examination may usually be made when access permits the eye to be placed within:
2.
ASME Section V, Article 9 requires a minimum illumination at the examination surface for direct visual examination of:
3.
Per ASME Section V, Article 9, a visual examination procedure is demonstrated as adequate by resolving a fine line of:
4.
Per ASME Section V, Article 9, a remote visual examination system must have a resolution capability:
5.
SNT-TC-1A recommends that NDT personnel demonstrate near-vision acuity of:
6.
According to SNT-TC-1A, the near-vision acuity examination should be administered:
7.
The colour contrast requirement of SNT-TC-1A requires the individual to:
8.
Under SNT-TC-1A, certification of NDT personnel is the responsibility of the:
9.
Under SNT-TC-1A, which activity is within the scope of a VT Level II?
10.
Per ASME Section V, Article 9, a change in a requirement identified as an essential variable in a written visual examination procedure requires:
11.
Under AWS D1.1 visual inspection acceptance criteria, cracks in a weld are:
12.
Under AWS D1.1 visual acceptance criteria, weld craters must be:
13.
AWS D1.1 visual acceptance criteria require, with respect to fusion, that:
14.
For certain high-strength quenched-and-tempered steels, AWS D1.1 delays final visual inspection after welding primarily to:
15.
Under ASME B31.3, a crack detected during visual examination of a girth weld in Normal Fluid Service is:
16.
API 510 covers:
17.
API 570 is the inspection code for:
18.
To ensure traceability, a visual examination report should include:
19.
When the requirements of ASME Section V conflict with the requirements of the referencing Code Section, which governs?
20.
ASME Section V, Article 9 primarily provides: