Skip to Content
Rating
0 0

There are no comments for now.

to be the first to leave a comment.

6. Per SOP-11-02 and SOP-11-04, acceptance inspection of work to AWS D1.1 shall be performed by:
18. Per SOP-11-04 (with SOP-07-01), the preliminary air test before a hydrostatic test is at: