ET II Specific - Set 2
Rating
0
0
There are no comments for now.
1.
For an encircling-coil production test, the reference standard should be:
2.
In encircling-coil testing of bar or tube, the ends of each length:
3.
A mill is setting up encircling-coil testing of nickel alloy tube. Which ASTM standard is written for this product?
4.
During production testing of steel tube with DC saturation, the reference standard signals are unstable and noisy. A likely cause is:
5.
A procedure (example) requires standardization checks at the start, every 4 hours and at the end. Which event should also prompt a check?
6.
Standardization was verified acceptable at 10:00. At 14:00 the reference signal is well outside tolerance. Which items must be re-examined?
7.
Which information belongs on an eddy current technique sheet?
8.
Under SNT-TC-1A, who is responsible for establishing and approving written eddy current procedures?
9.
Apart from setting up, standardizing and evaluating, which further duty does SNT-TC-1A assign to an ECT Level II?
10.
A client asks the Level II to adjust settings so that a tube with a rejectable indication will pass. The correct response is to:
11.
During tube analysis, a support plate signal looks distorted compared with the clean support signals in the same tube. It should be:
12.
In heat exchanger programs, rotating probes such as motorized pancake coils are mainly used to:
13.
A bobbin coil is least sensitive to which flaw orientation in tubing?
14.
A 2024 aluminum part reads within the expected T3 conductivity band (about 30% IACS). Under good practice this:
15.
When measuring conductivity, the part, the reference standards and the probe should be:
16.
When measuring paint thickness by liftoff, why should the uncoated standardization substrate be the same alloy as the part?
17.
When scanning close to the edge of an aircraft skin panel, how can edge-effect false calls be reduced?
18.
During a pencil-probe scan the operator lets the probe tilt. The resulting signal mainly resembles:
19.
After setting an alarm gate during standardization on a notch block, the Level II should:
20.
A heat exchanger eddy current report should include, among other items: